- 180,000+ ft2 facility including GMP production space, warehouse and offices
- Enclosed primary packaging suites with HEPA filtered individual rooftop unit (RTU) air handlers
- Low humidity and low oxygen packaging capabilities
- Secondary packaging and assembly areas
- Drug Enforcement Administration (DEA) schedule III-V drug cage
- In-house tooling design and fabrication
- Equipment dedicated for compliance packaging and specialty designs